Logistics — Melbourne, VIC
200 kW rooftop for a national 3PL
200 kW
System size
$61,400
Annual saving
3.4 yrs
Payback
+1.8%
vs forecast
“The system has beaten Yellowstone’s own model in its first full year. Finance costs are covered twice over by the savings.”
Operations Director, national logistics group